Skip to content
Skip to content
Menu
Home
Login
Menu
×
Home
Login
×
Home
Login
Unit 8: Dimensional Starter installation
Sorry, but you're not allowed to access this unit.
DIMENSIONAL STARTER INSTALLATION
Question #1:
What happens if you don’t cut back your first piece of starter 5⅝” or run the gable starter first?
You’ll waste material
Your first course of shingles will end up seam-on-seam with the starter in the keyways
Water will leak through the eave
The ridge vent won’t align
Question #2:
How much overhang should your starter strip have and what’s a good reference for that?
1 inch, use a pencil
About ½” — use your first knuckle on your pointer finger
⅛”, measure with tape
Flush with the drip edge
Question #3:
Where should starter strips be nailed?
Just behind the glue strip on the starter strip
Anywhere on the back edge
Right at the front of the strip
At a 45° angle through the shingle
0%
« Previous Unit
Skip to content
Open toolbar
Accessibility Tools
Accessibility Tools
Increase Text
Increase Text
Decrease Text
Decrease Text
Grayscale
Grayscale
High Contrast
High Contrast
Negative Contrast
Negative Contrast
Light Background
Light Background
Links Underline
Links Underline
Readable Font
Readable Font
Reset
Reset