Skip to content
Skip to content
Menu
Home
Login
Menu
×
Home
Login
×
Home
Login
Unit 5: Pipe Wrapping
Sorry, but you're not allowed to access this unit.
PIPE WRAPPING
Question #1:
Where on the pipe do you make your 45° cut in the dry-in?
At the top of the pipe
On the farthest edges of the pipe
At the base flange
Directly above the roofline
Question #2:
How many separate pieces of dry-in does it take to properly wrap a pipe in ice and water?
1
2
4
6
Question #3:
What is the name of the piece of ice and water that sits behind the pipe and is the last to be installed?
The cap
The underlay
The saddle
The collar
0%
« Previous Unit
Skip to content
Open toolbar
Accessibility Tools
Accessibility Tools
Increase Text
Increase Text
Decrease Text
Decrease Text
Grayscale
Grayscale
High Contrast
High Contrast
Negative Contrast
Negative Contrast
Light Background
Light Background
Links Underline
Links Underline
Readable Font
Readable Font
Reset
Reset